SEMATECH DOC ID #: 08074942A-ENG
Title: International SEMATECH Manufacturing Initiative (ISMI) Equipment Change Notification Method: Version 1
Author(s): David Becker;Lorn Christal;Randle Burton;
Document date: 07/28/2008
Descriptor(s): equipment change control;procedures;
Abstract:
This document from the MFGM057M project outlines procedures and
guidelines for equipment suppliers issuing equipment change
notifications. The method is applicable to changes to
semiconductor process and metrology equipment in a semiconductor
production environment, specifically those related to equipment
hardware, software, and calibration documentation. The method
does not apply to ancillary test equipment or internal
supplier/end-user change handling procedures and activities.
© Copyright 2008 SEMATECH, Inc.
Please read these important Trademark and legal notices